BMC were requested by Treble Cone Ski Area (TC) to provide inspection, video capture and 3D modelling of a difficult to access slope with stability / rockfall issues. BMC have worked with TC with Geosolve (geotechnical engineers) to provide a planned management strategy for annual works and immediate inspection response for any issues. The level of accuracy and ability to inspect detail at close range and record changes without the normal associated risks in inspecting a difficult access slope has enhanced TC’s management of the access road.