Our team creates 3D data rich models in Revit to seamlessly collaborate across multidisciplines. This collaborative approach increases efficiency, reduces waste/risk and provides high quality documentation to the client, tenderers and constructors adding significant value to the overall project.
With the utilisation of BIM, our team can coordinate the 3D models and drive changes early on in the design process through Virtual Design and Construction (VDC) meetings. Capturing changes early in the design process reduces waste and clashes on site, adding significant value to client, contractors and the overall design. During the construction period, cloud based BIM models can be viewed by the contractor and trades to gain improved understanding of the project, assisting with buildability and reducing requests for information. By utilising the data rich model, our team can accurately provide 4D time analysis data for the contractor to assist with site logistics and construction programming.
Our team can provide quantity take-offs from the 3D Revit documentation to accurately produce bills of quantities for anything from architectural finishes to volumes of concrete and tonnage of steel. These quantities can easily be coordinated with different building options, allowing the client/contractor to accurately assess different building options.
‘As built’ models can be created by our team and used for Facilities Management and Asset Management to assist with the operational maintenance of the building.
With the use of drone surveys and 3D point clouds our BIM team can easily produce 3D spatial models and turn these into 2D drawings. This 3D survey information can be visualised by engineers allowing them to efficiently assess and design strengthening works as required.